Features
- Ideal for cellular concrete P2: just hammer in and tighten – quick and easy
- Holds in almost all building materials
- Metal tip enables high holding values
- Directly usable due to pre-assembled screw


Building materials & Holding values
- The anchoring depth of the wall plug must be observed
- Drilling method and drill hole cleaning must be adapted to the building material
- The recommended loads only apply to installation in the building material, not for installation in joints
- Approved wall plugs must be used for fixings where safety is of importance (see also www.tox.de/safety+loads)

Description & Area of Application
- 3-way split spreader element with metal tip
- Shaft with rotation locks
- Wall plug is completely pre-assembled with galvanized countersunk screw with TX driver

Processing & Installation
- In cellular concrete P2 just hammer in without pre-drilling
- After setting the Apollo, be sure to tighten the screw – in aerated concrete, optimum holding values after 6 turns of the screw
- Drill into perforated brick and gypsum plasterboard without hammering in a rotary motion so that the webs in the perforated brick are not broken
- Holds in concrete and solid masonry through expansion
- Holds in perforated brick by spreading and tying
- Holds behind gypsum plasterboard by tying
- In cellular concrete (aerated concrete), a deep-set rear gripping (tying) is created
- Through installation
